Advertisement

ROADWORK

Major projects for the week of Aug. 27-Sept. 1

FREEWAYS & HIGHWAYS

Where: Ventura Freeway westbound; Reyes Adobe on-ramp Problem: Lane 2 closed Why: Shoulder repair When: Tuesday, Thursday, Friday 9 a.m.-2:30 p.m.

Where: Ventura Freeway southbound; Street to Ventura Boulevard overhead Problem: Lane 3 closed Why: Bridge rail repair When: Tuesday, 9 a.m.-3 p.m.

Where: California 118 eastbound; Moorpark grade crossing to New Los Angeles Avenue Problem: Lanes 1,2 closed Why: Stenciling When: Tuesday, 9:30 a.m.-3 p.m.

Advertisement

Where: California 118; California 34 to Butter Creek Road Problem: One-way traffic control Why: Pavement repair When: Monday-Friday, 9 a.m.-3 p.m.

CITY STREETS

* Camarillo

Where: Lewis Road from California 118 to Ventura Freeway. Problem: Possible delays Why: Resurfacing When: Through August

Where: Santa Rosa Road between Ventura Freeway and Adolfo Road. Problem: Periodic lane closures Why: Construction When: Continuing

Advertisement

Where: Ponderosa Drive between Fulton Street and Rosewood Avenue Problem: Detour Why: Construction When: Continuing

Where: Fulton Street and Daily Drive intersection area Problem: Flagger will control traffic Why: Asphalt overlay When: Work starts Aug. 28

Where: Santa Rosa Road, westbound between Upland Road and Oak Canyon Road Problem: Caution needed Why: Right shoulder work When: Continuing

Advertisement

Where: Daily Drive between Murray Avenue and Mobil Avenue Problem: Possible delays Why: Water and sewer line installation When: 8:30 a.m.-3 p.m., until further notice

* Oxnard

Where: Richmond Avenue Problem: Lane closures; flagger will control traffic Why: Sewer line work When: Continuing

Where: Wagon Wheel Road on-ramp to Ventura Freeway Problem: Ramp closed Why: Construction When: Continuing

Where: Oxnard Boulevard south of Gonzales Road Problem: Traffic restricted to one lane Why: Construction When: Continuing

Where: Victoria Avenue at Channel Islands Blvd. Problem: Lane closures Why: Construction When: Continuing

Where: Sturgis Road; Rice Avenue to Del Norte Blvd. Problem: Road closed Why: Construction When: Until Aug. 28

Advertisement

Where: C Street near Wooley Road, both directions Problem: Narrowed traffic lanes; no left turns allowed Why: Cable installation When: Continuing

Where: C Street between Elm Street and Kamala Street Problem: Lanes closures, parking restrictions Why: Construction When: Continuing

Where: Ventura Road near Vineyard Avenue Problem: One lane each way Why: Construction When: Continuing

Where: Ventura Road north of Vineyard Avenue

Problem: Congested traffic Why: Temporary truck crossing When: Continuing

Where: Saviers Road, Gisler Avenue, Date and California Street Problem: Parking restrictions Why: Water line construction When: Continuing

* Ventura

Where: Wake Forrest Avenue from Lafayette Street to Telegraph Road Problem: Flagman will control traffic Why: Resurfacing When: Through Aug. 31 9 a.m.- 4 p.m.

Advertisement